2 353 Result(s)
Results displayed per page
Company ID Publication date Status Beginning of message
EDF EDF-2026-00054 07/03/2026 09:21:37 Dismissed

Passage en DMO 52 minutes pour les TAC Dirinon 1&2 jusqu'au 09/03 à 8h.
-----------------------------
Until 09/03 8:00 am , coupling time for the Dirinon 1&2 combustion turbines is increased to 52 minutes.

EDF EDF-2026-00052 07/03/2026 09:21:07 Active

Passage en DMO 52 minutes pour les TAC Dirinon 1&2 jusqu'au 09/03 à 8h.
-----------------------------
Until 09/03 8:00 am , coupling time for the Dirinon 1&2 combustion turbines is increased to 52 minutes.

EDF EDF-2026-00053 07/03/2026 05:38:02 Inactive

Passage en DMO 11h30 pour le CCG de Martigues 6 jusqu'à nouvel avis (6h pour le couplage et 5h30 pour atteindre la PMD)
-----------------------------
Until further notice increased time of 11.5 hours for coupling and ramp-up to full load for the CCG unit of Martigues 6 (6.hours for coupling and 5.5 hours for reaching full load).

EDF EDF-2026-00043 05/03/2026 10:57:20 Inactive

Crue en cours sur la vallée Durance, perte de puissance potentielle jusqu'à 200MW.
-----------------------------
A flood is currently underway on the Durance valley. Power production capacity may be lost up to 200MW.

EDF EDF-2026-00035 03/03/2026 18:58:22 Active

Passage en DMO 40 h pour Cordemais 4 jusqu’à nouvel avis (36h pour le couplage et 4h pour atteindre la PMD)

-------------------------------------------------

Until further notice, increased time of 40 hours for coupling and ramp-up to full load for the CCG unit of Cordemais 4 (36 hours for coupling and 4 hours for reaching full load)

EDF EDF-2026-00038 03/03/2026 18:49:18 Inactive

Passage en DMO 13h pour le CCG de Martigues 6 jusqu'à nouvel avis (6h30 pour le couplage et 6h30 pour atteindre la PMD)
-----------------------------
Until further notice increased time of 13 hours for coupling and ramp-up to full load for the CCG unit of Martigues 6 (6h30 for coupling and 6h30 for reaching full load).

EDF EDF-2026-00040 03/03/2026 18:39:54 Active

Passage en DMO 21 h pour Cordemais 5 jusqu’à nouvel avis (17h pour le couplage et 4h pour atteindre la PMD)

-------------------------------------------------

Until further notice, increased time of 21 hours for coupling and ramp-up to full load for the CCG unit of Cordemais 5 (17 hours for coupling and 4 hours for reaching full load)

EDF EDF-2026-00051 03/03/2026 12:17:48 Inactive

Following an operational error, the aggregate production forecasts under OA published from 1 PM on March 2 on the RTE website (https:// www.services-rte.com/fr/visualisez-les-donnees-publiees-par-rte/previsions-de-production-et-capa-edf-oa.html) do not include the entire solar forecast.

The forecast has been underestimated of 600 MW at peak solar output for 02/03.

The intraday and day-ahead forecasts are fixed since 12 pm on March 3.

EDF EDF-2026-00050 03/03/2026 12:17:20 Inactive

Suite à une erreur opérationnelle, les prévisions de production agrégées sous OA publiées depuis le 02/03 13h sur le site RTE (https://www.services-rte.com/fr/visualisez-les-donnees-publiees-par-rte/previsions-de-production-et-capa-edf-oa.html) n’intègrent pas la totalité de la prévision photovoltaïque.

La prévision a été sous-estimée de 600 MW à la pointe solaire (13h-14h) pour le 02/03.

Les prévisions en infra-journalier et en journalier sont corrigées depuis 12h le 03/03.

EDF EDF-2026-00037 02/03/2026 23:40:22 Inactive

Passage en DMO 13h pour le CCG de Martigues 5 jusqu'à nouvel avis (6h30 pour le couplage et 6h30 pour atteindre la PMD)
-----------------------------
Until further notice increased time of 13 hours for coupling and ramp-up to full load for the CCG unit of Martigues 5 (6h30 for coupling and 6h30 for reaching full load).

European Regulation 1227/2011 on Wholesale Energy Market Integrity and Transparency (REMIT) requires producers to disclose to the public certain information concerning their assets. On this website you will find selected information related to planned and unplanned unavailability of EDF's production assets as well as other relevant information on the capacity and use of these assets.The unavailabilities planning of production units is EDF’s best estimate at publication time and it is based on the reasonable estimate of the time needed for the achievement of the planned maintenance on each unit.