05470_EDF_T_00300751

  • Current version of the outage - v26
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Actif
      Publication date : 29/05/2026 20:32:36
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 01/06/2026 11:30:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v25
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/05/2026 12:23:21
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 02/06/2026 03:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v24
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/05/2026 07:44:53
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 01/06/2026 03:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v23
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 28/05/2026 13:35:12
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 01/06/2026 00:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v22
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 28/05/2026 01:36:54
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 01/06/2026 05:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v21
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 27/05/2026 23:07:28
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 30/05/2026 15:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v20
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 27/05/2026 20:13:16
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 30/05/2026 12:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v19
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 27/05/2026 18:31:45
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 30/05/2026 09:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v16
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 27/05/2026 11:16:43
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 30/05/2026 05:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v15
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 27/05/2026 06:38:13
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 30/05/2026 01:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v14
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 26/05/2026 16:55:42
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 29/05/2026 23:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v13
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 26/05/2026 04:33:42
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 29/05/2026 06:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v12
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 26/05/2026 01:40:05
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 28/05/2026 18:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v11
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 25/05/2026 21:20:16
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 28/05/2026 16:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v10
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 25/05/2026 20:36:44
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 28/05/2026 12:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v9
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 25/05/2026 15:55:09
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 28/05/2026 07:30:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v8
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 25/05/2026 11:36:44
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 28/05/2026 05:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v7
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 25/05/2026 01:35:55
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 28/05/2026 01:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v6
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 24/05/2026 17:30:02
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 27/05/2026 21:00:00
      340 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v5
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 24/05/2026 11:09:39
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 778 MW
      --------
      Unit is currently ramping up by steps
      Next step : 778 MW.
      Between the : 24/05/2026 02:32:00
      and the : 27/05/2026 18:30:00
      345 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v4
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 24/05/2026 08:01:44
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 370 MW
      --------
      Unit is currently ramping up by steps
      Next step : 370 MW.
      Between the : 24/05/2026 02:32:00
      and the : 27/05/2026 18:30:00
      195 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v3
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 24/05/2026 05:12:11
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 383 MW
      --------
      Unit is currently ramping up by steps
      Next step : 383 MW.
      Between the : 24/05/2026 02:32:00
      and the : 27/05/2026 08:30:00
      195 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v2
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 24/05/2026 04:21:43
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 194 MW
      --------
      Unit is currently ramping up by steps
      Next step : 194 MW.
      Between the : 24/05/2026 02:32:00
      and the : 27/05/2026 08:30:00
      150 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v1
    • Entity : Generation
      Name : TRICASTIN 1
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 24/05/2026 02:32:39
      Cause : Complementary informations
      Complementary informations :
      Remontée par paliers en cours
      Prochain palier : 194 MW
      --------
      Unit is currently ramping up by steps
      Next step : 194 MW.
      Between the : 24/05/2026 02:32:00
      and the : 27/05/2026 08:30:00
      10 MW
      MW AVAILABLE POWER
      915 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.