EDF publishes a daily report of the minimum stable generation achievable for each nuclear unit in operation for the following two days, when a value is at least 100 MW higher on one hour than the minimums available on the open data site of EDF : https://opendata.edf.fr /pages/welcome. Since May 16, 2023, when changes occur past 4.30 pm (day D), a report is published for the Day D+1.