05470_EDF_T_00241014
-
Current version of the outage - v9
-
Entity : GenerationName : GRAVELINES 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : ActifPublication date : 14/08/2025 16:55:41Cause : FailureComplementary informations :Between the : 10/08/2025 22:38:00and the : 16/08/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v8
-
Entity : GenerationName : GRAVELINES 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 13/08/2025 11:36:02Cause : FailureComplementary informations :Between the : 10/08/2025 22:38:00and the : 15/08/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v7
-
Entity : GenerationName : GRAVELINES 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 13/08/2025 09:23:34Cause : FailureComplementary informations :Between the : 10/08/2025 22:38:00and the : 15/08/2025 07:30:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v6
-
Entity : GenerationName : GRAVELINES 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 12/08/2025 15:51:31Cause : FailureComplementary informations :
Arrêt susceptible d'être prolongéBetween the : 10/08/2025 22:38:00and the : 15/08/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v5
-
Entity : GenerationName : GRAVELINES 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 11/08/2025 21:20:59Cause : FailureComplementary informations :
Arrêt susceptible d'être prolongéBetween the : 10/08/2025 22:38:00and the : 13/08/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v4
-
Entity : GenerationName : GRAVELINES 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 11/08/2025 13:32:10Cause : FailureComplementary informations :Between the : 10/08/2025 22:38:00and the : 13/08/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v3
-
Entity : GenerationName : GRAVELINES 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 11/08/2025 05:14:06Cause : FailureComplementary informations :Between the : 10/08/2025 22:38:00and the : 12/08/2025 04:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v2
-
Entity : GenerationName : GRAVELINES 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 10/08/2025 23:32:49Cause : FailureComplementary informations :
La durée indiquée de l'indisponibilité correspond à une durée forfaitaire de 24h, évaluée sur la base du retour d'expérience sur le parc nucléaire.
Une nouvelle version sera publiée en fonction des diagnostics et des analyses qui seront réalisés.
--------
The duration of the unavailability is a pre-defined 24 hours period, assessed on the basis of the nuclear fleet feedback
A new version will be published according to diagnostic and technical instruction.Between the : 10/08/2025 22:38:00and the : 11/08/2025 22:38:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v1
-
Entity : GenerationName : GRAVELINES 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 10/08/2025 22:39:19Cause : FailureComplementary informations :
La durée indiquée de l'indisponibilité correspond à une durée forfaitaire de 24h, évaluée sur la base du retour d'expérience sur le parc nucléaire.
Une nouvelle version sera publiée en fonction des diagnostics et des analyses qui seront réalisés.
--------
The duration of the unavailability is a pre-defined 24 hours period, assessed on the basis of the nuclear fleet feedback
A new version will be published according to diagnostic and technical instruction.Between the : 10/08/2025 22:38:00and the : 11/08/2025 22:38:00550 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-