05470_EDF_T_00232537
-
Current version of the outage - v2
-
Entity : GenerationName : BLAYAIS 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : ActifPublication date : 05/07/2025 08:02:44Cause : Complementary informationsComplementary informations :
Tranche maintenue couplée par le gestionnaire de réseau, sans imposition de puissance.
---------------
Plant maintained in operation by TSO, without imposed power step.Between the : 05/07/2025 06:00:00and the : 07/07/2025 06:00:00905 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v1
-
Entity : GenerationName : BLAYAIS 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 04/07/2025 08:16:32Cause : Complementary informationsComplementary informations :
Tranche maintenue couplée par le gestionnaire de réseau, sans imposition de puissance.
---------------
Plant maintained in operation by TSO, without imposed power step.Between the : 05/07/2025 06:00:00and the : 07/07/2025 06:00:00950 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-