05470_EDF_T_00232144
-
Current version of the outage - v2
-
Entity : GenerationName : BLENOD 5Sector : Gaz fossileLocation : FranceMarket FranceType : PlannedStatus : CancelledPublication date : 02/07/2025 09:11:56Cause : Complementary informationsComplementary informations :
Essais prévus avec variations de puissance.
Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.
--------
Test runs.
In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules.
In case of any limitation, a specific message will be published.Between the : 02/07/2025 11:00:00and the : 02/07/2025 16:00:00180 MWMW AVAILABLE POWER427 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v1
-
Entity : GenerationName : BLENOD 5Sector : Gaz fossileLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 01/07/2025 19:45:40Cause : Complementary informationsComplementary informations :
Essais prévus avec variations de puissance.
Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.
--------
Test runs.
In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules.
In case of any limitation, a specific message will be published.Between the : 02/07/2025 11:00:00and the : 02/07/2025 16:00:00180 MWMW AVAILABLE POWER427 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-