05470_EDF_T_00224021

  • Current version of the outage - v23
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Actif
      Publication date : 17/06/2025 07:47:01
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 17/06/2025 09:15:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v22
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 15/06/2025 07:16:28
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 17/06/2025 08:00:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v21
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 14/06/2025 07:05:48
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 17/06/2025 00:00:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v20
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 13/06/2025 07:30:39
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 16/06/2025 00:00:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v19
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 12/06/2025 07:51:43
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 15/06/2025 00:00:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v18
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 11/06/2025 07:07:41
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 14/06/2025 00:00:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v17
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 10/06/2025 07:08:38
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 13/06/2025 00:00:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v16
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 09/06/2025 07:01:08
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 12/06/2025 00:00:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v15
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 08/06/2025 06:58:54
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 11/06/2025 00:00:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v14
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 07/06/2025 07:41:50
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 10/06/2025 00:00:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v13
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 06/06/2025 08:27:08
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 09/06/2025 00:00:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v12
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 05/06/2025 06:46:43
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 08/06/2025 00:00:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v11
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 04/06/2025 06:56:40
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 07/06/2025 00:00:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v10
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 03/06/2025 08:22:33
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 06/06/2025 00:00:00
      810 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v9
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 02/06/2025 07:47:15
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 05/06/2025 00:00:00
      800 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v8
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 01/06/2025 07:54:18
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 04/06/2025 00:00:00
      800 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v7
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 31/05/2025 07:37:40
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 03/06/2025 00:00:00
      800 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v6
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 30/05/2025 07:54:47
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 02/06/2025 00:00:00
      800 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v5
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/05/2025 17:49:11
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 01/06/2025 00:00:00
      800 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v4
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 28/05/2025 23:56:43
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 30/05/2025 00:00:00
      800 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v3
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 28/05/2025 17:01:48
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 23:30:00
      and the : 30/05/2025 00:00:00
      908 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v2
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 28/05/2025 09:02:39
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 28/05/2025 19:30:00
      and the : 31/05/2025 00:00:00
      800 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v1
    • Entity : Generation
      Name : FLAMANVILLE 3
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 27/05/2025 19:38:49
      Cause : Complementary informations
      Complementary informations :
      Essais prévus avec variation de puissance
      -------
      Tests runs with load variations
      Between the : 29/05/2025 09:30:00
      and the : 31/05/2025 00:00:00
      800 MW
      MW AVAILABLE POWER
      1620 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.