05470_EDF_T_00224021
-
Current version of the outage - v23
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : ActifPublication date : 17/06/2025 07:47:01Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 17/06/2025 09:15:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v22
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 15/06/2025 07:16:28Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 17/06/2025 08:00:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v21
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 14/06/2025 07:05:48Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 17/06/2025 00:00:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v20
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 13/06/2025 07:30:39Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 16/06/2025 00:00:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v19
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 12/06/2025 07:51:43Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 15/06/2025 00:00:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v18
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 11/06/2025 07:07:41Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 14/06/2025 00:00:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v17
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 10/06/2025 07:08:38Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 13/06/2025 00:00:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v16
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 09/06/2025 07:01:08Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 12/06/2025 00:00:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v15
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 08/06/2025 06:58:54Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 11/06/2025 00:00:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v14
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 07/06/2025 07:41:50Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 10/06/2025 00:00:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v13
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 06/06/2025 08:27:08Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 09/06/2025 00:00:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v12
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 05/06/2025 06:46:43Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 08/06/2025 00:00:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v11
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 04/06/2025 06:56:40Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 07/06/2025 00:00:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v10
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 03/06/2025 08:22:33Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 06/06/2025 00:00:00810 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v9
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 02/06/2025 07:47:15Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 05/06/2025 00:00:00800 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v8
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 01/06/2025 07:54:18Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 04/06/2025 00:00:00800 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v7
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 31/05/2025 07:37:40Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 03/06/2025 00:00:00800 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v6
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 30/05/2025 07:54:47Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 02/06/2025 00:00:00800 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v5
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/05/2025 17:49:11Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 01/06/2025 00:00:00800 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v4
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 28/05/2025 23:56:43Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 30/05/2025 00:00:00800 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v3
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 28/05/2025 17:01:48Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 23:30:00and the : 30/05/2025 00:00:00908 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v2
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 28/05/2025 09:02:39Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 28/05/2025 19:30:00and the : 31/05/2025 00:00:00800 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v1
-
Entity : GenerationName : FLAMANVILLE 3Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 27/05/2025 19:38:49Cause : Complementary informationsComplementary informations :
Essais prévus avec variation de puissance
-------
Tests runs with load variationsBetween the : 29/05/2025 09:30:00and the : 31/05/2025 00:00:00800 MWMW AVAILABLE POWER1620 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-