05470_EDF_T_00223085

  • Current version of the outage - v11
    • Entity : Generation
      Name : MONTEREAU 6
      Sector : Fossil Oil
      Location : France
      Market France
      Type : Planned
      Status : Actif
      Publication date : 30/05/2025 14:40:56
      Cause : Complementary informations
      Complementary informations :
      Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.

      -----------------------------------------------------------------------

      Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.
      Between the : 27/05/2025 16:30:00
      and the : 30/05/2025 15:30:00
      168 MW
      MW AVAILABLE POWER
      175 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v10
    • Entity : Generation
      Name : MONTEREAU 6
      Sector : Fossil Oil
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/05/2025 16:58:11
      Cause : Complementary informations
      Complementary informations :
      Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.

      -----------------------------------------------------------------------

      Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.
      Between the : 27/05/2025 16:30:00
      and the : 30/05/2025 15:30:00
      0 MW
      MW AVAILABLE POWER
      175 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v9
    • Entity : Generation
      Name : MONTEREAU 6
      Sector : Fossil Oil
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/05/2025 14:00:43
      Cause : Complementary informations
      Complementary informations :
      Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.

      -----------------------------------------------------------------------

      Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.
      Between the : 27/05/2025 16:30:00
      and the : 30/05/2025 15:30:00
      162 MW
      MW AVAILABLE POWER
      175 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v8
    • Entity : Generation
      Name : MONTEREAU 6
      Sector : Fossil Oil
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/05/2025 09:31:42
      Cause : Complementary informations
      Complementary informations :
      Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.

      -----------------------------------------------------------------------

      Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.
      Between the : 27/05/2025 16:30:00
      and the : 30/05/2025 17:30:00
      162 MW
      MW AVAILABLE POWER
      175 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v7
    • Entity : Generation
      Name : MONTEREAU 6
      Sector : Fossil Oil
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 28/05/2025 19:01:29
      Cause : Complementary informations
      Complementary informations :
      Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.

      -----------------------------------------------------------------------

      Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.
      Between the : 27/05/2025 16:30:00
      and the : 30/05/2025 17:30:00
      0 MW
      MW AVAILABLE POWER
      175 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v6
    • Entity : Generation
      Name : MONTEREAU 6
      Sector : Fossil Oil
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 27/05/2025 16:29:23
      Cause : Complementary informations
      Complementary informations :
      Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.

      -----------------------------------------------------------------------

      Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.
      Between the : 27/05/2025 16:30:00
      and the : 30/05/2025 17:30:00
      172 MW
      MW AVAILABLE POWER
      175 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v5
    • Entity : Generation
      Name : MONTEREAU 6
      Sector : Fossil Oil
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 27/05/2025 14:43:41
      Cause : Complementary informations
      Complementary informations :
      Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.

      -----------------------------------------------------------------------

      Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.
      Between the : 27/05/2025 16:00:00
      and the : 30/05/2025 17:30:00
      172 MW
      MW AVAILABLE POWER
      175 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v4
    • Entity : Generation
      Name : MONTEREAU 6
      Sector : Fossil Oil
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 26/05/2025 15:20:45
      Cause : Complementary informations
      Complementary informations :
      Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.

      -----------------------------------------------------------------------

      Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.
      Between the : 27/05/2025 14:30:00
      and the : 30/05/2025 17:30:00
      168 MW
      MW AVAILABLE POWER
      175 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v3
    • Entity : Generation
      Name : MONTEREAU 6
      Sector : Fossil Oil
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 26/05/2025 13:43:35
      Cause : Complementary informations
      Complementary informations :
      Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.

      -----------------------------------------------------------------------

      Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.
      Between the : 26/05/2025 16:00:00
      and the : 29/05/2025 17:30:00
      168 MW
      MW AVAILABLE POWER
      175 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v2
    • Entity : Generation
      Name : MONTEREAU 6
      Sector : Fossil Oil
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 23/05/2025 15:08:42
      Cause : Complementary informations
      Complementary informations :
      Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.

      -----------------------------------------------------------------------

      Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.
      Between the : 26/05/2025 14:30:00
      and the : 29/05/2025 17:30:00
      168 MW
      MW AVAILABLE POWER
      175 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v1
    • Entity : Generation
      Name : MONTEREAU 6
      Sector : Fossil Oil
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 23/05/2025 14:53:51
      Cause : Complementary informations
      Complementary informations :
      Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.

      -----------------------------------------------------------------------

      Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.
      Between the : 26/05/2025 14:30:00
      and the : 30/05/2025 00:00:00
      168 MW
      MW AVAILABLE POWER
      175 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.