Entity : GenerationName : MONTEREAU 6Sector : Fossil OilLocation : FranceMarket FranceType : PlannedStatus : ActifPublication date : 30/05/2025 14:40:56Cause : Complementary informationsComplementary informations :
Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.
-----------------------------------------------------------------------
Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.Between the : 27/05/2025 16:30:00and the : 30/05/2025 15:30:00168 MWMW AVAILABLE POWER175 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v10
-
Entity : GenerationName : MONTEREAU 6Sector : Fossil OilLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/05/2025 16:58:11Cause : Complementary informationsComplementary informations :
Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.
-----------------------------------------------------------------------
Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.Between the : 27/05/2025 16:30:00and the : 30/05/2025 15:30:000 MWMW AVAILABLE POWER175 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v9
-
Entity : GenerationName : MONTEREAU 6Sector : Fossil OilLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/05/2025 14:00:43Cause : Complementary informationsComplementary informations :
Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.
-----------------------------------------------------------------------
Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.Between the : 27/05/2025 16:30:00and the : 30/05/2025 15:30:00162 MWMW AVAILABLE POWER175 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v8
-
Entity : GenerationName : MONTEREAU 6Sector : Fossil OilLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/05/2025 09:31:42Cause : Complementary informationsComplementary informations :
Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.
-----------------------------------------------------------------------
Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.Between the : 27/05/2025 16:30:00and the : 30/05/2025 17:30:00162 MWMW AVAILABLE POWER175 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v7
-
Entity : GenerationName : MONTEREAU 6Sector : Fossil OilLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 28/05/2025 19:01:29Cause : Complementary informationsComplementary informations :
Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.
-----------------------------------------------------------------------
Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.Between the : 27/05/2025 16:30:00and the : 30/05/2025 17:30:000 MWMW AVAILABLE POWER175 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v6
-
Entity : GenerationName : MONTEREAU 6Sector : Fossil OilLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 27/05/2025 16:29:23Cause : Complementary informationsComplementary informations :
Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.
-----------------------------------------------------------------------
Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.Between the : 27/05/2025 16:30:00and the : 30/05/2025 17:30:00172 MWMW AVAILABLE POWER175 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v5
-
Entity : GenerationName : MONTEREAU 6Sector : Fossil OilLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 27/05/2025 14:43:41Cause : Complementary informationsComplementary informations :
Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.
-----------------------------------------------------------------------
Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.Between the : 27/05/2025 16:00:00and the : 30/05/2025 17:30:00172 MWMW AVAILABLE POWER175 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v4
-
Entity : GenerationName : MONTEREAU 6Sector : Fossil OilLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 26/05/2025 15:20:45Cause : Complementary informationsComplementary informations :
Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.
-----------------------------------------------------------------------
Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.Between the : 27/05/2025 14:30:00and the : 30/05/2025 17:30:00168 MWMW AVAILABLE POWER175 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v3
-
Entity : GenerationName : MONTEREAU 6Sector : Fossil OilLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 26/05/2025 13:43:35Cause : Complementary informationsComplementary informations :
Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.
-----------------------------------------------------------------------
Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.Between the : 26/05/2025 16:00:00and the : 29/05/2025 17:30:00168 MWMW AVAILABLE POWER175 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v2
-
Entity : GenerationName : MONTEREAU 6Sector : Fossil OilLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 23/05/2025 15:08:42Cause : Complementary informationsComplementary informations :
Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.
-----------------------------------------------------------------------
Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.Between the : 26/05/2025 14:30:00and the : 29/05/2025 17:30:00168 MWMW AVAILABLE POWER175 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v1
-
Entity : GenerationName : MONTEREAU 6Sector : Fossil OilLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 23/05/2025 14:53:51Cause : Complementary informationsComplementary informations :
Essais de requalification Essais prévus avec variations de puissance. Si une limitation de puissance se produit pendant l'essai, elle fera l'objet d'une publication spécifique.
-----------------------------------------------------------------------
Check tests Test runs. In this phase the dispatch schedule and the availability can be affected on short notice by the pending technical test schedules. In case of any limitation, a specific message will be published.Between the : 26/05/2025 14:30:00and the : 30/05/2025 00:00:00168 MWMW AVAILABLE POWER175 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-