05470_EDF_T_00113601
-
Current version of the outage - v8
-
Entity : GenerationName : DAMPIERRE 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : ActifPublication date : 02/11/2023 06:48:08Cause : FailureComplementary informations :Between the : 28/10/2023 11:25:00and the : 02/11/2023 08:00:000 MWMW AVAILABLE POWER890 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v7
-
Entity : GenerationName : DAMPIERRE 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 31/10/2023 12:23:11Cause : FailureComplementary informations :Between the : 28/10/2023 11:25:00and the : 02/11/2023 12:00:000 MWMW AVAILABLE POWER890 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v6
-
Entity : GenerationName : DAMPIERRE 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 30/10/2023 04:58:31Cause : FailureComplementary informations :Between the : 28/10/2023 11:25:00and the : 01/11/2023 05:00:000 MWMW AVAILABLE POWER890 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v5
-
Entity : GenerationName : DAMPIERRE 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 29/10/2023 16:27:15Cause : FailureComplementary informations :Between the : 28/10/2023 11:25:00and the : 31/10/2023 05:00:000 MWMW AVAILABLE POWER890 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v4
-
Entity : GenerationName : DAMPIERRE 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 29/10/2023 11:38:38Cause : FailureComplementary informations :Between the : 28/10/2023 11:25:00and the : 30/10/2023 23:00:000 MWMW AVAILABLE POWER890 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v3
-
Entity : GenerationName : DAMPIERRE 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 29/10/2023 07:13:51Cause : FailureComplementary informations :Between the : 28/10/2023 11:25:00and the : 30/10/2023 13:30:000 MWMW AVAILABLE POWER890 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v2
-
Entity : GenerationName : DAMPIERRE 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 28/10/2023 13:48:39Cause : FailureComplementary informations :Between the : 28/10/2023 11:25:00and the : 30/10/2023 00:00:000 MWMW AVAILABLE POWER890 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v1
-
Entity : GenerationName : DAMPIERRE 4Sector : NuclearLocation : FranceMarket FranceType : ForcedStatus : InactivePublication date : 28/10/2023 11:25:54Cause : FailureComplementary informations :
La durée indiquée de l'indisponibilité correspond à une durée forfaitaire de 24h, évaluée sur la base du retour d'expérience sur le parc nucléaire.
Une nouvelle version sera publiée en fonction des diagnostics et des analyses qui seront réalisés.
-
The duration of the unavailability is a pre-defined 24 hours period, assessed on the basis of the nuclear fleet feedback
A new version will be published according to diagnostic and technical instruction.Between the : 28/10/2023 11:25:00and the : 29/10/2023 11:25:000 MWMW AVAILABLE POWER890 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-