05470_EDF_T_00071047
-
Current version of the outage - v23
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : ActifPublication date : 22/10/2025 02:19:44Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Between the : 05/04/2025 00:00:00and the : 22/10/2025 03:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v22
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 22/10/2025 01:49:48Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Between the : 05/04/2025 00:00:00and the : 22/10/2025 02:30:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v21
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/10/2025 21:54:50Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Between the : 05/04/2025 00:00:00and the : 22/10/2025 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v20
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/10/2025 17:24:19Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Between the : 05/04/2025 00:00:00and the : 21/10/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v19
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/10/2025 10:42:25Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Between the : 05/04/2025 00:00:00and the : 21/10/2025 18:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v18
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/10/2025 09:41:51Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Between the : 05/04/2025 00:00:00and the : 21/10/2025 13:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v17
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/10/2025 07:51:41Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Between the : 05/04/2025 00:00:00and the : 21/10/2025 10:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v16
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/10/2025 04:56:59Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Between the : 05/04/2025 00:00:00and the : 21/10/2025 08:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v15
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/10/2025 03:05:21Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Between the : 05/04/2025 00:00:00and the : 21/10/2025 05:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v14
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/10/2025 02:50:56Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Between the : 05/04/2025 00:00:00and the : 21/10/2025 04:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v13
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/10/2025 00:47:02Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Between the : 05/04/2025 00:00:00and the : 21/10/2025 03:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v12
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 20/10/2025 23:48:26Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Between the : 05/04/2025 00:00:00and the : 21/10/2025 01:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v11
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 17/10/2025 17:40:10Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Between the : 05/04/2025 00:00:00and the : 21/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v10
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 17/10/2025 15:06:13Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
Between the : 05/04/2025 00:00:00and the : 21/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v9
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 14/10/2025 11:56:17Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
Between the : 05/04/2025 00:00:00and the : 18/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v8
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 14/10/2025 06:42:36Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 370MW
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
-
After its restart, the plant will gradually return by various load thresholds to full power.
The ramp-up period will take at least 48 hours.
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
Between the : 05/04/2025 00:00:00and the : 16/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v7
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 02/10/2025 16:44:40Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230Between the : 05/04/2025 00:00:00and the : 16/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v6
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 08/11/2024 11:14:32Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230Between the : 05/04/2025 00:00:00and the : 09/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v5
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 05/08/2024 17:55:53Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230Between the : 05/04/2025 00:00:00and the : 05/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v4
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 19/07/2024 16:06:52Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230Between the : 22/03/2025 00:00:00and the : 21/09/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v3
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/03/2024 16:57:46Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230Between the : 22/03/2025 02:00:00and the : 20/09/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v2
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/12/2023 14:55:24Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230Between the : 22/03/2025 02:00:00and the : 10/09/2025 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v1
-
Entity : GenerationName : BLAYAIS 4Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 22/03/2022 09:22:09Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 22/03/2025 02:00:00and the : 10/09/2025 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-