05470_EDF_T_00066679
-
Current version of the outage - v45
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : ActifPublication date : 30/12/2025 04:48:47Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 188 MW.
--------
After its restart, the plant will gradually return by various load threshold to full power.
The ramp-up period will take at least 48 hours.
First threshold after restart : 188 MW.Between the : 11/07/2025 23:00:00and the : 30/12/2025 12:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v44
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/12/2025 23:55:05Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 188 MW.
--------
After its restart, the plant will gradually return by various load threshold to full power.
The ramp-up period will take at least 48 hours.
First threshold after restart : 188 MW.Between the : 11/07/2025 23:00:00and the : 30/12/2025 04:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v43
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/12/2025 16:18:11Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 188 MW.
--------
After its restart, the plant will gradually return by various load threshold to full power.
The ramp-up period will take at least 48 hours.
First threshold after restart : 188 MW.Between the : 11/07/2025 23:00:00and the : 30/12/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v42
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/12/2025 16:03:56Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 188 MW.
--------
After its restart, the plant will gradually return by various load threshold to full power.
The ramp-up period will take at least 48 hours.
First threshold after restart : 188 MW.Between the : 11/07/2025 23:00:00and the : 29/12/2025 19:30:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v41
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/12/2025 08:47:59Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 188 MW.
--------
After its restart, the plant will gradually return by various load threshold to full power.
The ramp-up period will take at least 48 hours.
First threshold after restart : 188 MW.Between the : 11/07/2025 23:00:00and the : 29/12/2025 17:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v40
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 28/12/2025 19:11:10Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 188 MW.
--------
After its restart, the plant will gradually return by various load threshold to full power.
The ramp-up period will take at least 48 hours.
First threshold after restart : 188 MW.Between the : 11/07/2025 23:00:00and the : 29/12/2025 15:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v39
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 28/12/2025 10:28:23Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 188 MW.
--------
After its restart, the plant will gradually return by various load threshold to full power.
The ramp-up period will take at least 48 hours.
First threshold after restart : 188 MW.Between the : 11/07/2025 23:00:00and the : 29/12/2025 09:30:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v38
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 28/12/2025 10:27:30Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 188 MW.
--------
After its restart, the plant will gradually return by various load threshold to full power.
The ramp-up period will take at least 48 hours.
First threshold after restart : 188 MW.Between the : 11/07/2025 23:00:00and the : 29/12/2025 19:30:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v37
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 27/12/2025 18:30:25Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 188 MW.
--------
After its restart, the plant will gradually return by various load threshold to full power.
The ramp-up period will take at least 48 hours.
First threshold after restart : 188 MW.Between the : 11/07/2025 23:00:00and the : 28/12/2025 19:30:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v36
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 27/12/2025 09:40:39Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 188 MW.
--------
After its restart, the plant will gradually return by various load threshold to full power.
The ramp-up period will take at least 48 hours.
First threshold after restart : 188 MW.Between the : 11/07/2025 23:00:00and the : 28/12/2025 12:30:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v35
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 27/12/2025 08:03:50Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 188 MW.
--------
After its restart, the plant will gradually return by various load threshold to full power.
The ramp-up period will take at least 48 hours.
First threshold after restart : 188 MW.Between the : 11/07/2025 23:00:00and the : 28/12/2025 02:30:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v34
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 24/12/2025 21:03:09Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Premier palier à atteindre : 188 MW.
--------
After its restart, the plant will gradually return by various load threshold to full power.
The ramp-up period will take at least 48 hours.
First threshold after restart : 188 MW.Between the : 11/07/2025 23:00:00and the : 27/12/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v33
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 17/12/2025 17:42:49Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
Stop likely to be extended.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Arrêt susceptible d'être prolongé.
Between the : 11/07/2025 23:00:00and the : 27/12/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v32
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 17/12/2025 11:04:19Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
Stop likely to be extended.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Arrêt susceptible d'être prolongé.
Between the : 11/07/2025 23:00:00and the : 18/12/2025 21:30:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v31
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 17/12/2025 09:10:18Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
Stop likely to be extended.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Arrêt susceptible d'être prolongé.
Between the : 11/07/2025 23:00:00and the : 18/12/2025 19:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v30
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 28/11/2025 18:10:49Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
Stop likely to be extended.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Arrêt susceptible d'être prolongé.
Between the : 11/07/2025 23:00:00and the : 19/12/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v29
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 26/11/2025 20:05:28Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
Stop likely to be extended.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Arrêt susceptible d'être prolongé.
Between the : 11/07/2025 23:00:00and the : 09/12/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v28
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 19/11/2025 21:00:50Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 11/07/2025 23:00:00and the : 09/12/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v27
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 12/11/2025 09:12:02Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 11/07/2025 23:00:00and the : 24/11/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v26
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 07/11/2025 15:28:59Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 11/07/2025 23:00:00and the : 16/11/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v25
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 03/11/2025 16:55:28Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 11/07/2025 23:00:00and the : 11/11/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v24
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 31/10/2025 10:20:33Cause : Complementary informationsComplementary informations :
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Indépendamment du risque CSC, arrêt susceptible d'être prolongé.
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
-------
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231.
Regardless of stress corrosion cracking risk, outage duration may be extended.
Between the : 11/07/2025 23:00:00and the : 11/11/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v23
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 17/10/2025 10:18:42Cause : Complementary informationsComplementary informations :
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Indépendamment du risque CSC, arrêt susceptible d'être prolongé.
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
-------
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231.
Regardless of stress corrosion cracking risk, outage duration may be extended.
Between the : 11/07/2025 23:00:00and the : 06/11/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v22
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 02/10/2025 11:59:59Cause : Complementary informationsComplementary informations :
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Indépendamment du risque CSC, arrêt susceptible d'être prolongé.
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
-------
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231.
Regardless of stress corrosion cracking risk, outage duration may be extended.
Between the : 11/07/2025 23:00:00and the : 28/10/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v21
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 01/10/2025 08:05:50Cause : Complementary informationsComplementary informations :
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
La remontée durera au moins 48h.
Arrêt susceptible d'être prolongé.
--------
After its restart, the plant will gradually return by various load threshold to full power.
The ramp-up period will take at least 48 hours.
Stop likely to be extended.
Between the : 11/07/2025 23:00:00and the : 28/10/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v20
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 24/09/2025 14:32:44Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231.
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 11/07/2025 23:00:00and the : 18/10/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v19
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 11/07/2025 01:08:48Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231.
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 11/07/2025 23:00:00and the : 11/10/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v18
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 10/07/2025 08:37:30Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231.
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 11/07/2025 23:00:00and the : 01/10/2025 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v17
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/03/2025 08:11:44Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231.
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 12/07/2025 00:00:00and the : 12/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v16
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 26/12/2024 10:32:23Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231. The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage. This constraint is taken into account in the programming of the unit.
-------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.Between the : 12/07/2025 00:00:00and the : 12/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v15
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 20/11/2024 16:32:26Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 12/07/2025 00:00:00and the : 12/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v14
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 31/10/2024 18:39:14Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage. This constraint is taken into account in the programming of the unit.
-------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Between the : 12/07/2025 00:00:00and the : 12/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v13
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 31/10/2024 18:36:59Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage. This const
---
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentesBetween the : 12/07/2025 00:00:00and the : 12/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v12
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 04/09/2024 16:58:04Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 12/07/2025 00:00:00and the : 12/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v11
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 19/07/2024 16:01:39Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 12/07/2025 00:00:00and the : 19/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v10
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 31/05/2024 15:33:41Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 12/07/2025 00:00:00and the : 17/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v9
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/03/2024 16:52:41Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 05/07/2025 02:00:00and the : 10/10/2025 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v8
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/12/2023 15:01:29Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 05/07/2025 02:00:00and the : 12/10/2025 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v7
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/12/2023 14:49:47Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé : https://doaa.edf.fr/message/edf-2023-00230
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 05/07/2025 02:00:00and the : 12/10/2025 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v6
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 24/11/2023 16:07:22Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 05/07/2025 02:00:00and the : 12/10/2025 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v5
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/07/2023 15:49:22Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 07/06/2025 02:00:00and the : 14/09/2025 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v4
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 31/03/2023 17:37:08Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 07/06/2025 02:00:00and the : 13/09/2025 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v3
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 25/10/2022 20:00:44Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 07/06/2025 02:00:00and the : 15/09/2025 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v2
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 28/03/2022 12:46:04Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 18/01/2025 02:00:00and the : 28/04/2025 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v1
-
Entity : GenerationName : GRAVELINES 1Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 18/01/2022 02:10:11Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 18/01/2025 02:00:00and the : 03/05/2025 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-