05470_EDF_T_00058480
-
Current version of the outage - v24
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : ActifPublication date : 29/03/2025 08:06:07Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 01/11/2025 00:00:00and the : 18/06/2026 00:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v23
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 25/02/2025 10:26:10Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage.
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt.Between the : 01/11/2025 00:00:00and the : 18/06/2026 00:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v22
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 22/01/2025 23:17:06Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage.
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt.Between the : 13/09/2025 00:00:00and the : 28/04/2026 00:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v21
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/11/2024 13:39:15Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage.
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt.Between the : 13/09/2025 00:00:00and the : 15/04/2026 00:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v20
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 19/07/2024 16:01:54Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage.
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt.Between the : 06/09/2025 00:00:00and the : 08/04/2026 00:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v19
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 16/07/2024 15:41:12Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage.
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt.Between the : 06/09/2025 00:00:00and the : 29/03/2026 00:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v18
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 31/05/2024 15:33:49Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage.
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt.Between the : 02/08/2025 00:00:00and the : 22/02/2026 00:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v17
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/03/2024 16:53:03Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage.
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt.Between the : 12/07/2025 02:00:00and the : 01/02/2026 00:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v16
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 26/01/2024 17:44:33Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage.
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt.Between the : 12/07/2025 02:00:00and the : 28/01/2026 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v15
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/12/2023 15:02:13Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage.
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00230
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt.Between the : 05/07/2025 02:00:00and the : 21/01/2026 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v14
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/12/2023 14:50:34Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00231
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage.
Arrêt susceptible d'être prolongé : https://doaa.edf.fr/message/edf-2023-00230
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt.Between the : 05/07/2025 02:00:00and the : 21/01/2026 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v13
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 24/11/2023 16:07:46Cause : Complementary informationsComplementary informations :
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage. This constraint is taken into account in the programming of the unit.
----------------
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt. Cette contrainte est prise en compte dans la programmation de la tranche.Between the : 05/07/2025 02:00:00and the : 21/01/2026 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v12
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 31/03/2023 17:37:13Cause : Complementary informationsComplementary informations :
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage. This constraint is taken into account in the programming of the unit.
----------------
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt. Cette contrainte est prise en compte dans la programmation de la tranche.Between the : 21/06/2025 02:00:00and the : 07/01/2026 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v11
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 30/03/2023 10:35:12Cause : Complementary informationsComplementary informations :
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage. This constraint is taken into account in the programming of the unit.
----------------
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt. Cette contrainte est prise en compte dans la programmation de la tranche.Between the : 21/06/2025 02:00:00and the : 28/12/2025 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v10
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 23/02/2023 11:55:08Cause : Complementary informationsComplementary informations :
Arrêt susceptible d’être prolongé pour une durée totale de 160 jours
Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible : des baisses de production trop fréquentes nécessiteraient un report de cet arrêt.
-------------------------------------
Outage duration may be extended for a total of 160 days
The operation of this unit is already constrained by its fuel stock: lowering production too frequently would necessitate the postponement of this outage.Between the : 21/06/2025 02:00:00and the : 28/12/2025 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v9
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 25/11/2022 16:50:48Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 21/06/2025 02:00:00and the : 28/12/2025 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v8
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 07/07/2022 13:01:28Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 14/06/2025 02:00:00and the : 21/12/2025 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v7
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 19/05/2022 15:07:08Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 05/04/2025 02:00:00and the : 12/10/2025 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v6
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 25/03/2022 20:13:26Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 01/02/2025 02:00:00and the : 10/08/2025 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v5
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 07/02/2022 23:31:16Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 02/11/2024 02:00:00and the : 11/05/2025 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v4
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 07/02/2022 23:29:39Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 02/11/2024 02:00:00and the : 11/05/2025 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v3
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 28/01/2022 14:04:05Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 19/10/2024 02:00:00and the : 27/04/2025 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v2
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 26/11/2021 12:53:38Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 19/10/2024 02:00:00and the : 07/05/2025 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v1
-
Entity : GenerationName : FLAMANVILLE 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 28/09/2021 02:58:12Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 28/09/2024 02:00:00and the : 16/04/2025 02:00:000 MWMW AVAILABLE POWER1330 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-