05470_EDF_T_00047449

  • Current version of the outage - v29
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Actif
      Publication date : 07/03/2024 00:55:06
      Cause : Complementary informations
      Complementary informations :
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
      La remontée durera au moins 48h.
      Premier palier à atteindre : 180 MW.
      --------
      After its restart, the plant will gradually return by various load threshold to full power.
      The ramp-up period will take at least 48 hours.
      First threshold after restart : 180 MW.


      Between the : 10/06/2023 00:00:00
      and the : 07/03/2024 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v28
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 06/03/2024 23:43:03
      Cause : Complementary informations
      Complementary informations :
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
      La remontée durera au moins 48h.
      Premier palier à atteindre : 180 MW.
      --------
      After its restart, the plant will gradually return by various load threshold to full power.
      The ramp-up period will take at least 48 hours.
      First threshold after restart : 180 MW.


      Between the : 10/06/2023 00:00:00
      and the : 07/03/2024 01:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v27
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 06/03/2024 22:21:12
      Cause : Complementary informations
      Complementary informations :
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
      La remontée durera au moins 48h.
      Premier palier à atteindre : 180 MW.
      --------
      After its restart, the plant will gradually return by various load threshold to full power.
      The ramp-up period will take at least 48 hours.
      First threshold after restart : 180 MW.


      Between the : 10/06/2023 00:00:00
      and the : 07/03/2024 00:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v26
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 05/03/2024 09:12:49
      Cause : Complementary informations
      Complementary informations :
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
      La remontée durera au moins 48h.
      Premier palier à atteindre : 180 MW.
      --------
      After its restart, the plant will gradually return by various load threshold to full power.
      The ramp-up period will take at least 48 hours.
      First threshold after restart : 180 MW.


      Between the : 10/06/2023 00:00:00
      and the : 06/03/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v25
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 05/03/2024 05:40:50
      Cause : Complementary informations
      Complementary informations :
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
      La remontée durera au moins 48h.
      Premier palier à atteindre : 180 MW.
      --------
      After its restart, the plant will gradually return by various load threshold to full power.
      The ramp-up period will take at least 48 hours.
      First threshold after restart : 180 MW.


      Between the : 10/06/2023 00:00:00
      and the : 06/03/2024 01:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v24
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 03/03/2024 10:35:56
      Cause : Complementary informations
      Complementary informations :
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
      La remontée durera au moins 48h.
      Premier palier à atteindre : 180 MW.
      --------
      After its restart, the plant will gradually return by various load threshold to full power.
      The ramp-up period will take at least 48 hours.
      First threshold after restart : 180 MW.


      Between the : 10/06/2023 00:00:00
      and the : 05/03/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v23
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/02/2024 15:23:49
      Cause : Complementary informations
      Complementary informations :
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
      La remontée durera au moins 48h.
      Premier palier à atteindre : 180 MW.
      --------
      After its restart, the plant will gradually return by various load threshold to full power.
      The ramp-up period will take at least 48 hours.
      First threshold after restart : 180 MW.


      Between the : 10/06/2023 00:00:00
      and the : 04/03/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v22
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/02/2024 10:10:21
      Cause : Complementary informations
      Complementary informations :
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance.
      La remontée durera au moins 48h.
      Premier palier à atteindre : 180 MW.
      --------
      After its restart, the plant will gradually return by various load threshold to full power.
      The ramp-up period will take at least 48 hours.
      First threshold after restart : 180 MW.


      Between the : 10/06/2023 00:00:00
      and the : 02/03/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v21
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 27/02/2024 10:35:22
      Cause : Complementary informations
      Complementary informations :
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      ---------------
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.


      Between the : 10/06/2023 00:00:00
      and the : 02/03/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v20
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 22/02/2024 11:21:18
      Cause : Complementary informations
      Complementary informations :
      Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00239
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      ---------------
      Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00240
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.


      Between the : 10/06/2023 00:00:00
      and the : 29/02/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v19
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 19/02/2024 13:19:33
      Cause : Complementary informations
      Complementary informations :
      Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00239
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      ---------------
      Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00240
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.


      Between the : 10/06/2023 00:00:00
      and the : 25/02/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v18
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 09/02/2024 11:29:35
      Cause : Complementary informations
      Complementary informations :
      Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00240
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
      -------------------------------------
      Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00239
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      Between the : 10/06/2023 00:00:00
      and the : 21/02/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v17
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/01/2024 10:34:55
      Cause : Complementary informations
      Complementary informations :
      Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00240
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
      -------------------------------------
      Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00239
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      Between the : 10/06/2023 00:00:00
      and the : 12/02/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v16
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 18/01/2024 08:56:08
      Cause : Complementary informations
      Complementary informations :
      Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00240
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
      -------------------------------------
      Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00239
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      Between the : 10/06/2023 00:00:00
      and the : 02/02/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v15
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 03/01/2024 19:37:31
      Cause : Complementary informations
      Complementary informations :
      Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00240
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
      -------------------------------------
      Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00239
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      Between the : 10/06/2023 00:00:00
      and the : 23/01/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v14
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 21/12/2023 16:17:47
      Cause : Complementary informations
      Complementary informations :
      Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00240
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
      -------------------------------------
      Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00239
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      Between the : 10/06/2023 00:00:00
      and the : 13/01/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v13
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 18/12/2023 17:18:52
      Cause : Complementary informations
      Complementary informations :
      Stop is likely to continue.
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
      -------------------------------------
      Arrêt susceptible de se prolonger
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      Between the : 10/06/2023 00:00:00
      and the : 13/01/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v12
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 18/12/2023 16:29:13
      Cause : Complementary informations
      Complementary informations :
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
      -------------------------------------
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      Between the : 10/06/2023 00:00:00
      and the : 13/01/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v11
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 16/11/2023 09:10:10
      Cause : Complementary informations
      Complementary informations :
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
      -------------------------------------
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      Between the : 10/06/2023 00:00:00
      and the : 03/01/2024 23:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v10
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 07/06/2023 09:43:49
      Cause : Complementary informations
      Complementary informations :
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
      -------------------------------------
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      Between the : 10/06/2023 00:00:00
      and the : 24/12/2023 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v9
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 16/12/2022 23:44:24
      Cause : Complementary informations
      Complementary informations :
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
      -------------------------------------
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      Between the : 10/06/2023 02:00:00
      and the : 24/12/2023 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v8
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 12/12/2022 16:51:21
      Cause : Complementary informations
      Complementary informations :
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h. Réalisation d’END (Examens Non Destructifs) pouvant avoir un impact estimé jusqu’à 60 jours sur la durée de l’arrêt: https://www.edf.fr/sites/groupe/files/2022-09/EDF_Mise%20a%20jour%20Note%20Info%20CSC_21%20septembre2022.pdf
      Between the : 10/06/2023 02:00:00
      and the : 24/12/2023 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v7
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 26/10/2022 13:45:15
      Cause : Complementary informations
      Complementary informations :
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h. Réalisation d’END (Examens Non Destructifs) pouvant avoir un impact estimé jusqu’à 60 jours sur la durée de l’arrêt: https://www.edf.fr/sites/groupe/files/2022-09/EDF_Mise%20a%20jour%20Note%20Info%20CSC_21%20septembre2022.pdf
      Between the : 10/06/2023 02:00:00
      and the : 27/12/2023 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v6
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 12/10/2022 12:41:10
      Cause : Complementary informations
      Complementary informations :
      Le fonctionnement de cette tranche est dès à présent contraint par son stock de combustible. Réalisation d’END (Examens Non Destructifs) pouvant avoir un impact estimé jusqu’à 60 jours sur la durée de l’arrêt: https://www.edf.fr/sites/groupe/files/2022-09/EDF_Mise%20a%20jour%20Note%20Info%20CSC_21%20septembre2022.pdf
      Between the : 10/06/2023 02:00:00
      and the : 27/12/2023 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v5
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 22/09/2022 10:05:53
      Cause : Complementary informations
      Complementary informations :
      Réalisation d’END (Examens Non Destructifs) pouvant avoir un impact estimé jusqu’à 60 jours sur la durée de l’arrêt: https://www.edf.fr/sites/groupe/files/2022-09/EDF_Mise%20a%20jour%20Note%20Info%20CSC_21%20septembre2022.pdf
      ------------------------------
      Realisation of nondestructive examinations with a potential impact estimated up to 60 days on the outage duration: https://www.edf.fr/sites/groupe/files/2022-09/EDF_Mise%20a%20jour%20Note%20Info%20CSC_21%20septembre2022.pdf
      Between the : 10/06/2023 02:00:00
      and the : 27/12/2023 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v4
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 29/07/2022 19:22:03
      Cause : Complementary informations
      Complementary informations :
      Réalisation d’END (Examens Non Destructifs) pouvant avoir un impact estimé jusqu’à 60 jours sur la durée de l’arrêt: https://www.edf.fr/sites/groupe/files/2022-07/EDF_Mise%20a%20jour%20Note%20Info%20CSC_27juillet%202022.pdf
      ------------------------------
      Realisation of nondestructive examinations with a potential impact estimated up to 60 days on the outage duration: https://www.edf.fr/sites/groupe/files/2022-07/EDF_Mise%20a%20jour%20Note%20Info%20CSC_27juillet%202022.pdf
      Between the : 10/06/2023 02:00:00
      and the : 27/12/2023 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v3
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 26/03/2021 15:10:48
      Cause : Complementary informations
      Complementary informations :
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
      -------------------------------------
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      Between the : 10/06/2023 02:00:00
      and the : 27/12/2023 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v2
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 07/08/2020 18:28:04
      Cause : Complementary informations
      Complementary informations :
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
      -------------------------------------
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      Between the : 10/06/2023 02:00:00
      and the : 17/12/2023 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v1
    • Entity : Generation
      Name : GRAVELINES 2
      Sector : Nuclear
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 03/06/2020 02:06:07
      Cause : Complementary informations
      Complementary informations :
      After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
      -------------------------------------
      Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
      Between the : 03/06/2023 02:00:00
      and the : 24/11/2023 02:00:00
      0 MW
      MW AVAILABLE POWER
      910 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.