05470_EDF_T_00047355
-
Current version of the outage - v24
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : CancelledPublication date : 02/02/2024 22:25:07Cause : Complementary informationsComplementary informations :
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00239
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
-------------------------------------
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00240
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
Between the : 24/06/2023 00:00:00and the : 16/03/2024 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v23
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 02/02/2024 20:22:12Cause : Complementary informationsComplementary informations :
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00239
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
-------------------------------------
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00240
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
Between the : 24/06/2023 00:00:00and the : 16/03/2024 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v22
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 22/01/2024 19:18:45Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00240
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00239
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 24/06/2023 00:00:00and the : 11/02/2024 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v21
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 09/01/2024 10:11:16Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00240
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00239
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 24/06/2023 00:00:00and the : 01/02/2024 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v20
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 26/12/2023 18:22:52Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00240
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00239
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 24/06/2023 00:00:00and the : 22/01/2024 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v19
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 21/12/2023 16:19:02Cause : Complementary informationsComplementary informations :
Outage duration may be extended : https://doaat.edf.fr/message/edf-2023-00240
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé : https://doaat.edf.fr/message/edf-2023-00239
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 24/06/2023 00:00:00and the : 12/01/2024 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v18
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 13/12/2023 12:01:54Cause : Complementary informationsComplementary informations :
Stop is likely to continue
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 24/06/2023 00:00:00and the : 12/01/2024 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v17
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 04/12/2023 22:19:05Cause : Complementary informationsComplementary informations :
Stop is likely to continue
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 24/06/2023 00:00:00and the : 02/01/2024 23:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v16
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 18/08/2023 19:22:47Cause : Complementary informationsComplementary informations :
Stop is likely to continue
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Arrêt susceptible d'être prolongé
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 24/06/2023 00:00:00and the : 23/12/2023 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v15
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 15/06/2023 17:55:40Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 24/06/2023 00:00:00and the : 23/12/2023 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v14
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 08/06/2023 17:39:49Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 17/06/2023 00:00:00and the : 16/12/2023 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v13
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 25/05/2023 21:20:33Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 10/06/2023 00:00:00and the : 09/12/2023 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v12
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 25/05/2023 19:14:06Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 27/05/2023 00:00:00and the : 25/11/2023 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v11
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 25/05/2023 18:56:30Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 31/05/2023 00:00:00and the : 25/11/2023 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v10
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 15/03/2023 15:12:18Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 27/05/2023 00:00:00and the : 25/11/2023 00:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v9
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 16/12/2022 23:37:16Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.
Between the : 27/05/2023 02:00:00and the : 25/11/2023 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v8
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 22/09/2022 10:04:52Cause : Complementary informationsComplementary informations :
Réalisation d’END (Examens Non Destructifs) pouvant avoir un impact estimé jusqu’à 60 jours sur la durée de l’arrêt:https://www.edf.fr/sites/groupe/files/2022-09/EDF_Mise%20a%20jour%20Note%20Info%20CSC_21%20septembre2022.pdf
------------------------------
Realisation of nondestructive examinations with a potential impact estimated up to 60 days on the outage duration: https://www.edf.fr/sites/groupe/files/2022-09/EDF_Mise%20a%20jour%20Note%20Info%20CSC_21%20septembre2022.pdf
Between the : 27/05/2023 02:00:00and the : 25/11/2023 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v7
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 05/08/2022 16:07:18Cause : Complementary informationsComplementary informations :
Réalisation d’END (Examens Non Destructifs) pouvant avoir un impact estimé jusqu’à 60 jours sur la durée de l’arrêt: https://www.edf.fr/sites/groupe/files/2022-07/EDF_Mise%20a%20jour%20Note%20Info%20CSC_27juillet%202022.pdf
------------------------------
Realisation of nondestructive examinations with a potential impact estimated up to 60 days on the outage duration: https://www.edf.fr/sites/groupe/files/2022-07/EDF_Mise%20a%20jour%20Note%20Info%20CSC_27juillet%202022.pdf
Between the : 27/05/2023 02:00:00and the : 25/11/2023 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v6
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/07/2022 19:18:06Cause : Complementary informationsComplementary informations :
Réalisation d’END (Examens Non Destructifs) pouvant avoir un impact estimé jusqu’à 60 jours sur la durée de l’arrêt: https://www.edf.fr/sites/groupe/files/2022-07/EDF_Mise%20a%20jour%20Note%20Info%20CSC_27juillet%202022.pdf
------------------------------
Realisation of nondestructive examinations with a potential impact estimated up to 60 days on the outage duration: https://www.edf.fr/sites/groupe/files/2022-07/EDF_Mise%20a%20jour%20Note%20Info%20CSC_27juillet%202022.pdf
Between the : 27/05/2023 02:00:00and the : 10/12/2023 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v5
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 28/03/2022 12:37:55Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 27/05/2023 02:00:00and the : 10/12/2023 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v4
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 26/11/2021 12:49:26Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 27/05/2023 02:00:00and the : 18/11/2023 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v3
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 06/08/2021 14:46:46Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 27/05/2023 02:00:00and the : 28/11/2023 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v2
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 29/01/2021 13:43:22Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 27/05/2023 02:00:00and the : 13/12/2023 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v1
-
Entity : GenerationName : BLAYAIS 2Sector : NuclearLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 27/05/2020 02:15:10Cause : Complementary informationsComplementary informations :
After its restart, the plant will gradually return by various load thresholds to full power. The ramp-up period will take at least 48 hours.
-------------------------------------
Après son recouplage, la tranche remontera progressivement par palier de charge à sa pleine puissance. La remontée durera au moins 48h.Between the : 27/05/2023 02:00:00and the : 23/12/2023 02:00:000 MWMW AVAILABLE POWER910 MWMW MAXIMUM POWERThe unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-