05470_EDF_H_00118405

  • Current version of the outage - v2
    • Entity : Generation
      Name : SUPER BISSORTE 1 POMPE
      Sector : Hydro pumped storage
      Location : France
      Market France
      Type : Planifiée (pompe)
      Status : Actif
      Publication date : 11/08/2025 09:15:46
      Cause : Foreseen Maintenance
      Complementary informations :
      Between the : 11/08/2025 09:00:00
      and the : 11/08/2025 09:15:00
      0 MW
      MW AVAILABLE POWER
      158 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v1
    • Entity : Generation
      Name : SUPER BISSORTE 1 POMPE
      Sector : Hydro pumped storage
      Location : France
      Market France
      Type : Planifiée (pompe)
      Status : Inactive
      Publication date : 11/08/2025 08:09:22
      Cause : Foreseen Maintenance
      Complementary informations :
      Between the : 11/08/2025 09:00:00
      and the : 11/08/2025 11:00:00
      0 MW
      MW AVAILABLE POWER
      158 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.