05470_EDF_H_00101039
-
Current version of the outage - v5
-
Entity : GenerationName : MONTEZIC 1 POMPESector : Hydro pumped storageLocation : FranceMarket FranceType : PlannedStatus : ActifPublication date : 20/06/2025 17:30:37Cause : Foreseen MaintenanceComplementary informations :Between the : 16/06/2025 08:00:00and the : 20/06/2025 16:30:000 MWMW AVAILABLE POWER218.5 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v4
-
Entity : GenerationName : MONTEZIC 1 POMPESector : Hydro pumped storageLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 10/06/2025 16:56:23Cause : Foreseen MaintenanceComplementary informations :Between the : 16/06/2025 08:00:00and the : 20/06/2025 18:00:000 MWMW AVAILABLE POWER218.5 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v3
-
Entity : GenerationName : MONTEZIC 1 POMPESector : Hydro pumped storageLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 15/05/2025 09:17:13Cause : Foreseen MaintenanceComplementary informations :Between the : 16/06/2025 06:00:00and the : 20/06/2025 18:00:000 MWMW AVAILABLE POWER218.5 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v2
-
Entity : GenerationName : MONTEZIC 1 POMPESector : Hydro pumped storageLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 08/04/2025 13:17:04Cause : Foreseen MaintenanceComplementary informations :Between the : 16/06/2025 06:00:00and the : 27/06/2025 18:00:000 MWMW AVAILABLE POWER218.5 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v1
-
Entity : GenerationName : MONTEZIC 1 POMPESector : Hydro pumped storageLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 04/04/2024 09:14:20Cause : Foreseen MaintenanceComplementary informations :Between the : 16/06/2025 08:00:00and the : 27/06/2025 18:00:000 MWMW AVAILABLE POWER218.5 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-