05470_EDF_H_00099443

  • Current version of the outage - v2
    • Entity : Production
      Nom de la centrale : HERMILLON
      Sector : Hydro run-of-river and pondage
      Location : France
      Market France
      Type : Planned
      Status : Cancelled
      Publication date : 30/05/2025 07:26:52
      Cause : Foreseen Maintenance
      Complementary informations :
      Between the : 30/09/2025 07:00:00
      and the : 30/09/2025 17:00:00
      13 MW
      MW AVAILABLE POWER
      129 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.

  • Earlier version of the outage - v1
    • Entity : Production
      Nom de la centrale : HERMILLON
      Sector : Hydro run-of-river and pondage
      Location : France
      Market France
      Type : Planned
      Status : Inactive
      Publication date : 19/03/2024 19:38:15
      Cause : Foreseen Maintenance
      Complementary informations :
      Between the : 06/10/2025 07:00:00
      and the : 06/10/2025 17:00:00
      13 MW
      MW AVAILABLE POWER
      129 MW
      MW MAXIMUM POWER

      The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.