05470_EDF_H_00095988
-
Current version of the outage - v2
-
Entity : GenerationName : SUPER BISSORTE 2 POMPESector : Hydro pumped storageLocation : FranceMarket FranceType : PlannedStatus : CancelledPublication date : 14/05/2024 10:01:05Cause : Foreseen MaintenanceComplementary informations :Between the : 21/05/2024 08:00:00and the : 21/05/2024 17:00:000 MWMW AVAILABLE POWER158 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-
-
Earlier version of the outage - v1
-
Entity : GenerationName : SUPER BISSORTE 2 POMPESector : Hydro pumped storageLocation : FranceMarket FranceType : PlannedStatus : InactivePublication date : 19/12/2023 17:50:57Cause : Foreseen MaintenanceComplementary informations :Between the : 21/05/2024 08:00:00and the : 21/05/2024 17:00:000 MWMW AVAILABLE POWER158 MWMW MAXIMUM POWER
The unavailabilities planning of a production unit is EDF’s best estimate at the time of publication and it is based on an estimate of the duration reasonably required for the planned works or events liable to affect the asset. In case of overlapping outages, whether forced or planned, the practice is to use the lowest available power for each overlapping period.
-